top of page
Engineer in a high-visibility vest examines blueprints next to a water heating system with copper pipes.

New build plumbing planned around the build in Brighton, Hove & East Sussex

27+ years of plumbing and heating experience. First-fix and second-fix stages covered. Systems tested before handover.

What keeps a new build moving properly

Planned from drawings

Supply and waste routes are set out to match the build, not guessed on the day.

First-fix to second-fix

Work is phased to suit the programme so each stage is ready when needed.

Tested before handover

Pressure, flow and drainage checks help confirm the completed system works properly.

New build plumbing needs planning, not guesswork

When you bring Harding Plumbing & Heating Limited into a new build, the pipework has to suit the plans, the property layout and the build sequence from the start. We work from construction drawings to map supply routes, waste routes, fixture positions and sensible access for future maintenance. That early planning matters because once walls and floors are closed up, moving a bad decision is never the cheap part of the project. Good new build plumbing is about getting the unseen parts right first so the finished bathrooms, kitchen and heating points land where they should.

Detailed ground floor plumbing layout plan with annotations and a rolled-up blueprint beside it.
Engineer in a high-visibility vest examines blueprints next to a water heating system with copper pipes.

Built in stages and checked before handover

With Harding Plumbing & Heating Limited, the work can move through first-fix before the building is closed up, then second-fix once the kitchens, bathrooms and heating components are ready to connect. Coordination with the wider programme is a big part of keeping things moving. We prepare service points for each phase, then test pressure, flow, drainage and final connections before handover. If you can send drawings, build stages and intended fixture positions early, it becomes much easier to plan the job cleanly and avoid hold-ups later on.

Frequently asked questions

What information helps before new build plumbing starts?

Construction drawings, fixture positions, build stages and access details all help. The clearer the information is at the start, the easier it is to plan supplies, wastes and service points that fit the build rather than forcing changes once the structure begins to close up.

Can the plumbing be completed in stages?

Yes. New build plumbing is usually split between first-fix and second-fix work. That allows the main pipe routes and service positions to be installed before walls and floors are finished, with final connections made later when the rooms and heating components are ready.

What gets tested before handover?

We check the system for sound connections and working performance, including pressure, flow, drainage and final fixture or component connections where relevant. The aim is to make sure the plumbing behaves as it should before the completed build is passed over for use.

Engineer in a high-visibility vest examines blueprints next to a water heating system with copper pipes.

Discuss the build before work starts

Call Harding Plumbing & Heating Limited or send us a form enquiry with drawings, build stages and planned fixture positions.

bottom of page